Method Statement
_OverviewThe tests will be carried out on two pumps, namely the Abakus Pump and the Nafe Pump. The objective of the experiments is to determine the efficiency, durability, ease of use, and capacityof the pumps.
The tests will be run in the structures laboratory by measuring the flow rate of the pumps, the force required to activate the pumps and the wear experienced by the pumps after repeated use. Prior to Testing- Set up protective cover for water spillage
- Build and assemble pump’s body and platform - Lift and secure pump’s body and platform to the top of the gantry - Build and assemble pump’s mechanism to pump’s body - Fill water tank with water During Testing- Operate pumps to fill a 2 litre jug while recording starting and finishing time
- Record any observation made during the pumping - Operate the pumps constantly for 1 hour and record change of temperature of components - Alter (i.e. make improvements to) pumps as needed - Repeat testing for 1 hour every weekday for a set number of weeks - Tidy testing area after each use - Secure the testing area by placing barriers after each use After Testing- Record any wear and tear on the pumps
- Disassemble pumps - Recycle undamaged material - Dispose of unusable materials - Final cleaning of testing area |